02 June 2008
We "stripped" down everything on the wall and windows...

Move all the benches to the centre. Fortunately we labeled the benches. They are all of different length.

Musical equipment ...

Curtain... (Notice the poisition of the air conditioner)

Teck Chung the strong man...


The curtains are all gone...

"Maggie... aiyo....
Taking them off is "a piece of cake!"

The wall must be bare!

ok... job done...

Teck Chung take the opportunity to fix the light behind the cross.

Our strong youths.

06 June 2008
Scalfolding in place. Light fixture and aircon taken down. Windows sealed with prefab concrete panel.

Timbers... lots of thing

14 June 2008
Ok, see the new aircon position.

This is where the worship team did their practice - fellowship hall.

17 June 2008
New wall sound proving material in place and lights are up on the right side.

Work on the left side starting....

21 June 2008
With just eight more days to go. Work is now concentrated at the back of the church hall.

Electric saw... generated lots of saw dust.

This thing drives the pneumatic nail gun.

Electrical rewiring...

The sound proving material (fibre glass) for wall panel.

24 June 2008
Pressure is now on. Job must be completed by the 27 June 2008. Workers are working day and night.

These two are incredible. They "walk" around with the "ladder".

25 June 2008
New light for the worship team...

The layered celing at the entrance.

Dirt was still everywhere. But in two days, it will be transformed!

27 June 2008
Day zero! Everything is completed. Again Teck Chung was passionately fixing his gargets.

See the nice new ceiling.

ok... all done. Benches and chairs are now in place for the simulcast on 28 June.

Got sound or not?

Maggie ... removing the labeling. Just some fine touches here and there.

28 June 2008
Finally it is completed. Just some fine touches.

Teck Chung and Kong Yu did the finer tuning on the audio and video wiring.

Nice or not?

Cosy.... may God bless this place for His glory.